The waterfront is the reason the district exists in the shape it does. Two kilometres of promenade run from Reading in the south to Tel Baruch in the north, with about 300 marina moorings planned at the northern end and beach cafés along the Central frontage.

The southern edge is the most complicated stretch in the plan: Reading power station, the fuel tanks, the marina basin and the park are all being rewritten at the same time. That is worth knowing before assuming any particular view or access route is settled.

_Sources: Shavnu Journal: parks and the beach, 2026-08._

## What the plan fixes

- A 2 km waterfront promenade, from Reading to Tel Baruch. _(Plan TA/4444 validation sheet, via Shavnu, 2020-03)_
- About 300 marina moorings planned. _(Plan TA/4444 validation sheet, via Shavnu, 2020-03)_
- Reading power station, fuel tanks, marina and park are being replanned together. _(Shavnu Journal: hotels, marina, Reading, 2026-08)_

## Waterfront units

_Areas appear only where a per-unit figure has been published. A complex-wide gross is not a unit area._

| Unit | Sub-area | Uses | Area | Opening | Status |
|---|---|---|---|---|---|
| The beach promenade | Central promenade | beach cafés, sport, marina | not published | 2030–2035 | Planned |

## Next

- [Hotels](https://sdedov.city/en/hotels)
- [Getting here](https://sdedov.city/en/getting-here)

---

_Sde Dov — an independent guide to daily life in Sde Dov, Tel Aviv. Every number carries a source and a date._
_HTML version: https://sdedov.city/en/beach_